This site uses third-party website Tracking technologies to offer its services, continuously improve them, and display advertisements in line with users' interests. By continuing to use and browse our site, you agree to our Privacy policy .

Viega LLC – Recognized leader in press technology for plumbing and piping systems

Select Country

  • AAlbania
  • Algeria
  • Australia
  • Austria
  • Azerbaijan
  • BBahrain
  • Belgium
  • Belize
  • Bosnia
  • Brazil
  • Bulgaria
  • CCambodia
  • Canada
  • Caribbean Islands
  • Chile
  • China
  • Colombia
  • Costa Rica
  • Croatia
  • Cyprus
  • Czech Republic
  • DDenmark
  • Dominican Republic
  • EEcuador
  • Egypt
  • Estonia
  • FFinland
  • France
  • GGeorgia
  • Germany
  • Greece
  • Guatemala
  • HHonduras
  • Hong Kong
  • Hungary
  • IIceland
  • India
  • Indonesia
  • Iraq
  • Ireland
  • Israel
  • Italy
  • JJapan
  • Jordan
  • KKazakhstan
  • Kosovo
  • Kuwait
  • LLatvia
  • Lebanon
  • Lithuania
  • Luxembourg
  • MMacedonia
  • Malaysia
  • Malta
  • Mexico
  • Moldavia
  • Montenegro
  • Morocco
  • NNamibia
  • Netherlands
  • New Zealand
  • Nicaragua
  • Norway
  • OOman
  • PPakistan
  • Panama
  • Peru
  • Philippines
  • Poland
  • Portugal
  • QQatar
  • RRepublic of Korea
  • Romania
  • SSaudi Arabia
  • Serbia
  • Singapore
  • Slovakia
  • Slovenia
  • South Africa
  • Spain
  • Sweden
  • Switzerland
  • TTaiwan
  • Thailand
  • Trinidad and Tobago
  • Tunisia
  • UUkraine
  • United Arab Emirates
  • United Kingdom
  • United States of America
  • VVietnam
  • YYemen




Construction of Viega's Ohio Plant Nears the Finish Line


May 15, 2025 | Viega


Updates on Viega’s New Ohio Facility

Viega's commitment to advancing U.S. manufacturing and strengthening the communities we call home is taking shape in Mantua, Ohio. Construction crews continue to make exciting progress, and we are gearing up to serve our customers with even greater speed, efficiency and innovation.

If you have been following our journey, you know the Mantua plant represents more than just a building. It represents a major investment in American industry, local economic growth and the future of Viega's service capabilities.

Today, we are thrilled to share the latest milestones that bring us even closer to full operations and highlight how this facility will help us deliver on our promise of installing lifelines for the buildings of tomorrow.

All Systems Go
Crew of five people on a construction site

We are excited to announce that permanent power to the facility was activated on February 25. This crucial step has resulted in us being able to swiftly get all systems online and our equipment operational. We have also successfully set up the facility's Wi-Fi and IT server room, ensuring seamless connectivity across the plant.

The energy and infrastructure coming online are more than technical checkboxes. They are proof that our vision for this plant is coming to life. For an inside look at how we are building a future-ready facility, check out our recent LinkedIn post on the server room setup.

Bringing in the Heavy Equipment
Forklifts moving large pallet

Another exciting leap forward is installing our first major production equipment, the Elbow Press Machine. This machinery will play a key role in our manufacturing operations and marks the beginning of an exciting new phase in expanding our North American footprint. All the equipment for the first line has arrived, been installed and FAT has begun. As of this month, we're on track for sellable production by July 1st and are anticipating the arrival of more equipment by the end of May.

Built to the Highest Standards
Man using pressgun to install MegaPress

Safety has been a top priority since day one of the construction process. Our MegaPress® fire suppression system is now fully installed, reinforcing our commitment to the highest safety standards and ensuring the plant is protected and secure.

Sustainability is top-of-mind for this new location and our commitment to energy use and waste reduction, including our ambitious goals for carbon neutrality. From environmentally conscious construction practices to all-electric machinery, we are building a plant that reflects our responsibility to the environment and future generations.

Gathering the Team
Emily Pajek Headshot.jpg

Our team is coming together, too. The first wave of employees has successfully transitioned from training at our Kansas facility to full-time work in Ohio. Their talent, expertise and energy are already helping to shape the culture and success of the new plant.

One of these team members is Emily Pajeck, whose journey to leadership in Ohio highlights the exceptional skill driving this project forward. You can learn more about Emily and her inspiring story in our recent employee spotlight.

We are looking for more dedicated team members who are ready to get this new plant off to a phenomenal start. Interested candidates can explore open positions and learn about joining our team on the Viega Careers page.

We are excited to be part of the Mantua community and create a lasting impact on the local economy by supporting growth and opportunity in the region.

Full Steam Ahead

From firing up our power and IT systems to the arrival of our first major production equipment, every milestone brings us closer to full operations in Ohio. We are proud of the progress and look forward to the road ahead.

Stay tuned for more updates through our blog, LinkedIn and Careers page as you follow us on our journey into the heartland.



Why wait? Subscribe to the Viega blog today